FOOTINGS:
8” x 16” Poured Footing 2500#
Two (2) #4 continuous rebar at mid span
FOOTING DRAIN:
Schedule 20 perf pipe around perimeter of footing
#2 Stone coverage under red rosin paper
FOUNDATION:
8” x 7’10” Poured Walls - 3500#
2’ Vertical #4 Rebar placed 4’ on center
Two (2) #4 horizontal rebar places on top set of ties
1/2” x 8” anchor bolts placed 6’ to 8’ on center
6” Wide foam sill sealer under 2” x 6” treated sill plate
WATERPROOFING:
Exterior ties snapped and filled with tar
One (1) Spray on coat of waterproofing - common to home only
SLABS:
4” Poured slab in basement with 6mil poly vapor barrier
5” Poured slab in garage with 24” on center #4 rebar each way (slab pitched to driveway)